What gets checked
Resin and brass are checked against the drawing when they arrive. On the floor, first article, in-process and final inspection are recorded per lot. The record goes into the box with the goods, not into a folder in the office.
Equipment
- Video measuring system for pin position and coplanarity
- X-ray coating thickness gauge for gold and tin
- Insertion and withdrawal force tester
- Salt spray chamber, 24 and 48 hour runs
- Constant temperature and humidity chamber
Documents
Material certificates for resin and base metal, REACH statements and dimensional reports are available if you ask before the run starts. Asking afterwards means we have to dig through the lot file, and sometimes the answer is no.
Certificates
ISO 9001 since 2015. RoHS declarations are issued per shipment rather than per year, because resin suppliers change formulations more often than the certificate cycle suggests.