Mold shop
Wire EDM, CNC milling and surface grinding. We cut housings and terminal dies here. A new housing mold takes 12 to 18 days depending on cavity count. Existing molds are stored on site and serviced on a schedule, so a worn core pin does not stop a running order.
Injection
Vertical and horizontal presses from 30 to 120 tons. Materials we run most: PA6T and PA9T for parts that go through reflow, PBT for through-hole parts where cost matters more than temperature, LCP for thin walls.
Stamping
Progressive dies for brass, phosphor bronze and beryllium copper. Pin position is checked with a vision system before the reel goes to plating. If a die starts drifting, we see it on the reel, not on your board.
Plating
Gold flash from 3 to 30 µin, selective gold on the contact area only, and matte tin. Thickness is measured by X-ray on each lot and written into the inspection record.
Assembly and packing
Automatic insertion for standard position counts, manual for short runs. Packing is tube by default. Trays for odd counts, tape and reel for SMT parts.
Numbers we work to
- Pin position: ±0.02 mm, ±0.05 mm on bodies longer than 50 mm
- Housing: ±0.05 mm
- Insulation resistance: 1,000 MΩ min at 500 VDC
- Withstanding voltage: 500 VAC for one minute
- Operating temperature: −40 °C to +105 °C with PA6T