A standard connector sample leaves in 2 working days from confirmation. The drawing review and the stock check happen the same day, cutting or a plating change takes one day, and the second day is inspection, packing and the courier’s collection cut-off. Parts that need a new insert or a new mold are a different schedule, and we quote that separately rather than hiding it inside an average.

Two days is not a marketing number. It is what the sequence allows when the part already exists and the drawing answers the four questions the shop needs: contact material, plating thickness, housing material and position count.

Where the 48 hours go

Step When What decides it
Drawing review and quotation Same day Whether the drawing states plating and material
Stock pull or cut to length Day 1 Standard position count or a cut-down from a 2×40
Plating change Day 1 Standard thickness is in stock; a special one adds a run
Inspection and packing Day 2 Whether a dimensional report is requested
Courier collection Day 2 The cut-off time, not the flight

The two days are working days. An order confirmed at 17:00 on Friday starts on Monday, and a public holiday moves everything by a day. We confirm the ship date in the quotation so there is no ambiguity later.

What still takes longer, and why we say so

A position count outside the standard range. 2×5 to 2×40 comes off existing molds. A 2×50 or a 2×3 needs an insert change: roughly 15 days, because the mold has to come out of production, be cut, trialled and inspected.

A new mold. A new pitch, a new body height or a new contact geometry is 25–30 days and a tooling charge. No amount of expediting compresses steel and heat treatment.

A first article to a customer format. AS9102 or PPAP adds two to three days, because the report is a document with its own review, not a printout.

Selective plating. Masking is a hand-loaded rack step. It is one day on a normal run and longer if the rack has to be made for the part.

How to keep it at two days

  • Send the four numbers: contact material, plating on the contact area and on the tail, housing material, position count.
  • Ask for a stock sample when the part is a standard count. Those ship the same day if the courier has not cut off.
  • Book the courier on your own account. Collection is usually faster than ours because you control the pickup request.
  • Do not ask for a first article report on the sample unless you need it. It is one of the two things that reliably adds a day.

What arrives in the box

The samples, a dimensional report for the sample lot, the material and plating specification, and the RoHS declaration on request. If the sample is a cut-down from a standard mold, the report says so, because the cut edge is not the production finish.

For a part that is going into a qualification file rather than onto a bench, tell us at the enquiry stage. The paperwork changes the schedule, and it is better to know that on day one than on day three.

Are samples free?

Standard parts, free up to five pieces. Custom and cut-down parts are charged at the piece price plus the setup, and the setup is credited against the first production order.

Can a sample ship the same day?

If it is a standard position count in the standard plating, yes, provided the request arrives before the courier cut-off. Anything that has to be cut or plated starts the two-day clock.

Why do modified versions take three weeks?

A modified housing, connector position or firmware is a new part, not a stock item. Three weeks covers the tooling change, a trial shot and a first article, and we would rather quote three weeks than promise a week and explain the delay afterwards.

Send the four numbers and the quantity and we will confirm the ship date, not a lead time range. Standard parts ship from the pin header range; if the position count is outside the standard set, read tooling lead time first.