The MOQ comes from three minimums that stack: the plating barrel needs a minimum load to run evenly, the brass strip is bought in reels, and the machine setup is charged once per run. For a standard 2.54 mm header those land at about 1,000 pieces; for a plated-to-order part with selective gold, closer to 2,000.
When a quote says 5,000, it usually means the part is not in the standard mold and the run has to justify a mold slot.
The three minimums
| Constraint | Typical minimum | Why |
|---|---|---|
| Plating barrel load | 500–1,000 pcs | Too few parts and the current density is uneven; plating thickness varies across the load |
| Brass strip reel | set by pin count | A reel of strip is consumed by a run; a partial reel is scrap or stock |
| Machine setup | fixed cost per run | Mold change, press setup, first article, all amortised over the run |
Why selective gold pushes it higher
Selective plating needs masking, which is a hand-loaded rack step. The rack holds a fixed number of parts and the setup is the same whether the run is 500 or 5,000. Below about 2,000 the setup dominates the piece price and the quote becomes unattractive for both sides.
Three ways to order below MOQ
- Buy catalog stock. If the part is a standard position count and plating, it may already be on the shelf and the MOQ drops to one box.
- Cut from a standard part. A 2×40 cut to 2×13 is a manual operation; 100 pieces is realistic and the price is higher per piece.
- Pay the setup. We will run 300 pieces if the setup is paid in full. It is honest and sometimes the right answer for a pilot build.
What actually drives the price at low volume
At 500 pieces the price is mostly setup: mold change, press setup, plating rack load, inspection. At 10,000 the price is mostly material and machine time. That is why a 500-piece quote can be three times the per-unit price of a 10,000-piece quote and neither is unfair.
If you need a low-volume run, ask for the setup cost separately. It shows you whether the MOQ is a real constraint or a policy.
Can I mix position counts in one order?
Usually not in one run. Each position count needs its own mold setup, so two counts means two setups. The exception is if both come off the same mold with an insert change, which is fast but still a stop.
Does a higher quantity reduce lead time?
No, it usually extends it. A 50,000-piece run is scheduled into a mold slot; a 2,000-piece run can fit into a gap. Lead time is driven by queue, not volume.
Is the MOQ negotiable on a repeat order?
Yes, once the mold and the plating rack are set up and the strip is in stock. The first order carries the setup; later orders can be smaller.
Tell us the annual volume and the position count and we will tell you which of the three routes is cheapest for the first order. Standard parts are listed in the pin header range; tooling economics are covered in tooling lead time.